Project Gallery

Some of our projects:

  • System: Generation of chilled water for the process consisting of: 3 REYMSA brand cooling towers, filtering system, 70,000 liter storage tank, 6 100Hp pumps (N-5+1), frequency converters, galvanized pipe system . 40 slotted connection and TRACER SC+ automated control system.
  • Capacity: 74,580,000 Btu/hr // 5,280gpm
  • Year: 2023
  • System: Distribution system for hot water, chiller water and process steam.
  • Year: 2023
  • System: Forced ventilation with 13 wall extractors, 32 louvers with metal filter hoods of 90, 16 hanging heaters, package units with zoning by area, bathroom extraction and mini-split for guard houses.
  • Capacity: 303,440cfm of ventilation, 18 Ton of cooling for offices and 6,400,000 btu/hr of heating.
  • Year: 2023
  • System: Two handling units for a clean room, direct expansion, Heat pump, with supply/return duct based on double wall galvanized sheet, fiberglass insulation and volume control damper. Integration to BMS system.
  • Capacity: 100Ton of refrigeration installed.
  • Year: 2023
  • System: Paint booth extraction system, forced extraction with GREENHECK wall extractors, air movement with KaleFans brand HVLS fans, washed air with in-line heating and mini-split for offices.
  • Capacity: 1,380,000 cfm of air movement and 144,000 cfm of forced extraction.
  • Year: 2020
  • System: Ventilation system consisting of 12 axial fans in the wall, 7.5 HP motor, GREENHECK brand and 20 NAMM brand louvers of 8 feet x 4 feet with drainable fixed fins. For a warehouse area of 22,000 m2.
  • Capacity: 500,000 CFM
  • Year: 2019
  • System: Generation of chiller water for the copper oxychloride cooling process with an external titanium exchanger.
    Refrigeration
  • Capacity: 120 Ton.
  • Year: 2018